Access and scheduling
Your shift roster determines the move sequence. The operations lead marks the final staffed positions at the old address and the first rows needed at the new one. We plan around those release points, including a separate area for furnishings that can move before active seats.
Dense rows also change the building plan. We measure the clearance needed to carry bench sections out without blocking staffed aisles or emergency exits. At the destination, the loading door, freight elevator, and cart path must lead to a staging area outside the rows being assembled. Tell us whether building management requires a Certificate of Insurance and which evening or weekend access windows are available. Your telecom team's installation window belongs on the same schedule, after the furnishings for that shift are in place.