Access and scheduling
Lease overlap determines the sequence. Give us the dates when the new suite opens for deliveries, when the old suite must be empty, and when either landlord limits dock or elevator use. Staff may change desks on different dates. We map each wave against access periods, including keys, badges, loading areas, and any Certificate of Insurance required by either building.
Swing space needs a floor plan showing what belongs there and who can release it for the final leg. Your facilities lead identifies temporary seats and when they must clear for the next department. We use separate labels for the temporary stop and final destination, keeping loads from overlapping in a shared corridor. Evening or weekend windows can be requested for a department's handoff. Each landlord controls building access; your office contact approves changes to the wave order.